x

Search in
Sort by:

Question Status:

Search help

  • Simple searches use one or more words. Separate the words with spaces (cat dog) to search cat,dog or both. Separate the words with plus signs (cat +dog) to search for items that may contain cat but must contain dog.
  • You can further refine your search on the search results page, where you can search by keywords, author, topic. These can be combined with each other. Examples
    • cat dog --matches anything with cat,dog or both
    • cat +dog --searches for cat +dog where dog is a mandatory term
    • cat -dog -- searches for cat excluding any result containing dog
    • [cats] —will restrict your search to results with topic named "cats"
    • [cats] [dogs] —will restrict your search to results with both topics, "cats", and "dogs"

Can I work while packaging?

Just a simple question.

I'm on a very tight deadline and there's currently problems in the packaged build. I need to package often to debug those problems but also need to get actual work done.

I'm wondering what would happen if I continued to work+save while the game was packaging? Would it save my new changes into the package? Ignore them? Cause problems?

Same question for compiling the c++ code during a package.

Thanks!

Product Version: UE 4.13
Tags:
more ▼

asked Sep 02 '16 at 04:32 PM in Packaging & Deployment

avatar image

Juice-Tin
152 38 37 45

(comments are locked)
10|2000 characters needed characters left
Viewable by all users

1 answer: sort voted first

Hello Juice-Tin,

Technically, yes you can keep working while your packaging process is occurring. This can result in some unexpected results however as the cooking will be going on in this stage. This means that while you're editing your level, your blueprints, or any other assets, there's no telling if any of these changes will or will not be added into the packaged product. If the asset hasn't been cooked yet and you save in some new changes, those changes will be included in the packaged product. If the cook has already happened, then the changes you make won't be in the packaged product.

When it comes to compiling, this would not be advised. The packaging process itself will be compiling the project. This means that if you start compiling before the packaging process gets to that point, it'll fail compiling as the compiler won't be available. The opposite will happen if it's already compiling. If the compiling process is done (which means the packaging most likely won't be going on much longer anyway) then any changes/compiles are fine but won't be seen in the packaged product.

Hope this helps!

more ▼

answered Sep 06 '16 at 06:16 PM

avatar image Juice-Tin Sep 06 '16 at 07:40 PM

Perfect, thankyou!

(comments are locked)
10|2000 characters needed characters left
Viewable by all users
Your answer
toggle preview:

Up to 5 attachments (including images) can be used with a maximum of 5.2 MB each and 5.2 MB total.

Follow this question

Once you sign in you will be able to subscribe for any updates here

Answers to this question